Chapter 1 - Calibrations

Chapter 1 – Calibrations

 

  1.   00:15 – pH Calibration

  2.   00:55 – Manual Calibration

  3.   02:10 – Examine Calibrations

  4.   03:30 – New Calibration Template (Fluoride)

  5.   05:15 – Modify Existing Calibration Template

Chapter 2 - Titration Method

Chapter 2 – Titration Method

 

  1.   00:15 – Changing Injection Settings

  2.   01:00 – Changing Preferences and Zooming in a Replay

  3.   02:35 – Curve Smoothing and Filter Settings

  4.   03:40 – How to Change Sample and Titrant Information

  5.   04:55 – Replay Titration

  6.   06:05 – Titration Stopping Criteria

Chapter 3 - Equations, Reports and QCs

Chapter 3 – Equations, Reports and QCs (Part 1)

 

  1.   00:15 – Adding a QC Flag to a Report

  2.   06:05 – Adding functions to a Report

  3.   14:45 – Changing the Layout of a Report

 


Chapter 3 – Equations, Reports and QCs (Part 2)

 

  1.   00:15 – Creating a New Report List

  2.   01:40 – How to Filter Reports for Specific Data

  3.   03:25 – Increasing Decimal Places Shown in a Report

  4.   04:40 – Making a New Historical Report

  5.   08:10 – Making a New In-Run Report

  6.   15:35 – Making a Quick Report

 


Chapter 3 – Equations, Reports and QCs (Part 3)

 

  1.   00:15 – Manually Exporting Data

  2.   02:30 – Modify Specify Report Step

  3.   03:30 – Modifying an Equation Set

  4.   05:10 – Printing a Report

  5.   06:40 – Review Existing QC Data

  6.   07:30 – Setting up a QC Regime

  7.   08:55 – Setting up Exporting as a Report List Destination

  8.   10:50 – Setting up Printing as a Report List Destination

  9.   12:10 – Viewing and Printing QC Data

Chapter 4 - Schedules

Chapter 4 – Schedules

 

  1.   00:15 – Adding in Snippets

  2.   01:40 – Changing Stability Times

  3.   02:40 – Changing the Calibration Template in a Schedule

  4.   03:45 – Changing the Equation Set in a Schedule

  5.   04:45 – Changing the Titration Method in a Schedule

  6.   05:50 – Inserting Individual Steps

  7.   07:00 – Making a Pump Test Schedule

  8.   09:55 – Modifying a Calibration Schedule

  9.   10:55 – Setting up a QC Schedule

Chapter 5 - Timetables

Chapter 5 – Timetables

 

  1.   00:15 – Creating a Timetable Template

  2.   02:15 – Editing an Autorun Button

  3.   02:55 – Linking a Timetable to an Autorun Button

  4.   04:15 – Modifying a Timetable Template

  5.   05:45 – Pausing a Run (ESC Key)

  6.   06:30 – Stopping a Run (STOP Key)

  7.   07:10 – pH Calibration in Run

  8.   09:50 – View Current Sample Results

Chapter 6 - Hardware Setup

Chapter 6 – Hardware Setup

 

  1.   00:15 – Autosampler Communication

  2.   01:00 – Buret and Meter Addition

  3.   03:05 – Changing Autosampler Baud Rate

  4.   03:50 – Changing Pump Flow Rates

  5.   04:35 – Interface Hardware Setup (Briefing)

  6.   05:20 – Manually Operating the Autosampler

  7.   06:45 – Purging a Buret

  8.   07:20 – Reading a Meter

  9.   07:50 – Reading an Analog Signal

Chapter 7 - Database Management

Chapter 7 – Database Management

 

  1.   00:15 – Regular Archiving

  2.   02:55 – Big Archiving

  3.   04:30 – Retrieving

  4.   05:25 – Zipping a Database

  5.   07:00 – Unzipping a Database

Chapter 8 - Manual Temperature

Chapter 8 – Manual Temperature

 

  1.   00:15 – Manually Entering Calibration Temperature

  2.   01:15 – Manually Entering Sample Temperature

Chapter 9 - User Account and Password Control

Chapter 9 – User Account and Password Control

 

  1.   00:15 – Enabling User Account and Password Control of PC-Titrate

  2.   03:35 – Creating a User Account with Limited Accessibility